Long five foot leaded glass window or transom. Textured clear glass give light and privacy. Attractive leaded design with shield. Currently housed in a wooden frame - the overall dimensions are for the stained glass and the frame. Located in NY
Dimensions: Height: 60 in (152.4 cm)Width: 14 in (35.56 cm)Depth: 2 in (5.08 cm)
Condition: Wear consistent with age and use. Minor fading. Normal century old age with possible bowing, fading, small line cracks, warping, window needs to be tightened within frame.
Reference Number:Seller: 3091-1ST-NE
top of page
SKU: 3091-1ST-NE
$900.00Price
bottom of page

